Egegaz A.Ş. Aliaga Terminal Sea Water Extraction System Constr. Prefabr. and Erection Work and Sea Dredging and Pipe Laying
2 Reinforced Concrete LNG Tanks with a Capacity of 140.000m3 (Using Post Tensioning)
- Reinforced Concrete Tanks are built on Pile Foundation and for Earthquake Protection there are Seismic Isolation Bearings between spread foundations and on pile foundation
Diameter Φ=82m
Height h= 35,50m
Sea Water Extraction System Civil, Manifacture and Erection Works
- In the Sea: At 7,10m Level with a dimention of  65x25m Reinforced Concrete Intake Structure
- Erection of Steel Pipes with a Diameter of Φ=2500mm from the level (-30.00) to the level (-5.00)m in the sea
Total Concrete : 11.300m3 + 38.194m3  ≅  49.500m3
Total Reinforcement Steel : 804ton + 5.059ton  ≅  5.900ton
Steel Manufacture : 233ton + 1.225ton  ≅   1.460ton
Φ=2500mm Steel Pipe : 1.289m
Seismic Isolation Bearings : 706 pieces
Completed
07-03-2001
Egegaz Co.Inc.
Aliağa - İzmir
2.146.175,00.-$